Concrete & Masonry

Mortar Calculator

Bags of mortar for block, brick and stone work, matched to mortar type and joint size.

Inputs

Results

Adjust the inputs to see your result.

About this calculator

Mortar estimates are usually given per 100 blocks or per 1,000 bricks, which makes them useless mid-project. This calculator starts from your wall area and unit size, and returns bags by type — N for above-grade walls, S for below-grade and load-bearing work.

What this number means

Mortar is sold by the bag but consumed by the joint, and the only honest conversions are the yield tables: how many units one bag actually lays. Those yields are stable across brands for pre-mix — about 30 standard blocks or 110 modular bricks per 80 lb bag — because joint dimensions, not brand chemistry, set the volume.

The result also shows the mixed volume your bags represent (about 0.88 cu ft per 80 lb bag), which is the number to compare against site-mixed mortar if you are deciding between pre-mix bags and a cement-lime-sand order.

The formula

  • Yield per 80 lb bag: ~30 standard blocks (36 half-high, 42 half blocks); ~110 modular bricks (100 queen, 88 king)
  • 60 lb bags yield 0.75 × the 80 lb figure
  • Bags = Units ÷ yield per bag, rounded up
  • Mixed mortar volume ≈ Bags × 0.88 cu ft (80 lb) or 0.66 cu ft (60 lb)

Mortar type changes the mix proportions and strength, not the volume — the bag count is the same for N, S, M and O.

Worked example

500 standard blocks, type S, 80 lb bags.

  • Yield = 30 blocks per bag → 500 ÷ 30 = 16.7 → 17 bags
  • Mixed volume ≈ 17 × 0.88 ≈ 15 cu ft of mortar
  • The same 500 units in modular brick would take only ceil(500 ÷ 110) = 5 bags — brick joints are far smaller than block joints

Assumptions and limitations

  • Yields assume 3/8 in joints, struck flush. Head joints left partially empty (a common shortcut) reduce use but weaken the wall — the estimate assumes the job done properly.
  • Yields are for pre-mixed bagged mortar. Site-mixed mortar is ordered as cement + lime + sand; as a rough conversion, 15 cu ft of mixed mortar ≈ 6 bags of masonry cement plus about 0.55 cu yd of sand, but proportions vary by type — confirm with your supplier.
  • Repointing old work uses mortar differently (joints are raked out and refilled to depth) — these yields are for new laying.
  • Coloured mortar and additives do not change volume yields.