Roofing

Metal Roofing Calculator

Panels and panel length for a metal roof, from eave length, pitch and panel coverage width.

Inputs

ft
ft
/ 12
%

Results

Adjust the inputs to see your result.

About this calculator

Metal panels run from eave to ridge, so the order is a count across the eave and a length along the slope. This calculator counts panels by coverage width — not panel width, so laps are not double-counted — and works out panel length from the pitch multiplier.

What this number means

Metal roofing is ordered by the panel, and panels run from eave to ridge — so the two numbers that matter are how many fit across the eave and how long each one must be. The panel count comes from coverage width, not panel width: the lap that weatherproofs the joint eats an inch or two of every panel, and counting full panel widths leaves you short.

The slope length is where the pitch multiplier earns its keep. A 6/12 pitch stretches a 15 ft horizontal run into 16.77 ft of panel, and that extra length is real material — panels are cut to order, so a short order cannot be stretched and a long one cannot be returned easily.

The formula

  • Pitch multiplier = √(1 + (rise ÷ 12)²)
  • Slope length = Horizontal run × pitch multiplier
  • Panels per plane = ceil(Eave length ÷ coverage width)
  • Total panels = Panels per plane × 2 planes × (1 + waste %), rounded up
  • Roof area = 2 × eave length × slope length; Squares = roof area ÷ 100

Worked example

A gable roof: 40 ft eave, 15 ft run, 6/12 pitch, 36 in coverage, 10% waste.

  • Pitch multiplier: √(1 + 0.5²) = 1.118
  • Slope length: 15 × 1.118 = 16.77 ft — order 17 ft panels
  • Panels per plane: 40 ÷ 3 = 13.33 → 14 panels
  • Total: 14 × 2 = 28, with waste 28 × 1.10 = 30.8 → 31 panels
  • Roof area: 2 × 40 × 16.77 = 1,341.6 sq ft (13.42 squares)

Assumptions and limitations

  • A symmetric gable roof: two equal planes. For a hip roof, treat the result as a starting estimate and add the hip allowance in the waste figure — hip end planes are trapezoids, not rectangles.
  • Panels are counted per plane across the eave; ridge cap, gable trim, valley flashing and fasteners are separate items, not included here.
  • Panel length is rounded up to the next whole foot, as suppliers cut to order in whole-foot increments.
  • Overhang beyond the eave and ridge is not included — add it to the run before calculating if your panels extend past the fascia.

Frequently asked questions