Outdoor, Deck & Fence

Gravel Calculator

Cubic yards and tons of gravel, crushed stone or sand for driveways, paths and drainage.

Inputs

in
%
$

Results

Adjust the inputs to see your result.

About this calculator

Aggregates are sold by the ton but measured by volume, and density varies by material — a cubic yard of pea gravel weighs about 1.3 tons, crushed stone closer to 1.4. This calculator handles the conversion for your chosen material and depth, including compaction allowance.

What this number means

Aggregates live in two unit systems at once: you measure the job in cubic yards, but the yard sells by the ton and the truck is weighed. The conversion between them is the material's density, and it is not universal — a cubic yard of crushed stone weighs about 1.4 tons, pea gravel nearer 1.3, and wet sand can exceed both. Picking the right material in the calculator is what makes the tonnage honest.

The order figure adds a compaction allowance because loose stone is not finished stone: a driveway layer rolled and trafficked settles measurably, and topping up a finished driveway with a second small delivery costs more than ordering the extra 5% up front.

The formula

  • Cubic yards = Area (sq ft) × Depth (in) ÷ 324
  • Tons = Cubic yards × density (pea gravel 1.30 · crushed stone 1.40 · river rock 1.35 · sand 1.35 · decomposed granite 1.45 tons per cu yd)
  • Tons to order = Tons × (1 + compaction %)
  • Coverage check: 1 ton of crushed stone covers roughly 55 sq ft at 4 in deep

Worked example

A 12 × 30 ft driveway, 4 in of crushed stone.

  • Volume = 360 sq ft × 4 ÷ 324 = 4.44 cu yd
  • Weight = 4.44 × 1.40 = 6.22 tons
  • With 5% for compaction: 6.5 tons to order (yards round to the half ton)

Assumptions and limitations

  • Densities are for loose, dry material as delivered. Rain-soaked stockpiles weigh more per yard — if your delivered tonnage looks high after a wet week, that is water, not short measure.
  • Depth is the finished, compacted depth. If you are placing in two lifts, this calculator gives the total; order in two deliveries only if the job is phased.
  • Driveway estimates assume the excavation and base are separate line items — road base/crusher run uses the same maths with the crushed-stone density.
  • Bagged gravel (0.5 cu ft bags) is roughly 54 bags per cubic yard — viable for a path, painful for a driveway. The calculator reports yardage and tonnage; multiply cu ft by 2 for the 0.5 cu ft bag count.

Frequently asked questions